top of page
LRF-Ext-1-1536x1024.jpg

Your Trusted Framing Partner

From order to site in FOUR WEEKS

Your Aspirations, Our Creation

Our traditional stickbuilt frame service allows timber frames to be constructed directly on-site rather than in a factory. This flexible approach is ideal for projects with limited access or bespoke designs, offering the same precision and quality as pre-manufactured systems while reducing transport costs and lead times.

PXL_20220704_084134031.jpg

Social Housing

Houses, Flats and Retirement properties

2-Worth-School-Handover-Post-3-1024x1024_edited.jpg

Commercial Properties

Schools, Visitors centres and Sports clubs

graeme-williamson-architects-twin-house-hero_dezeen_2364_col_0.jpg

Bespoke Builds

Eco-homes with the highest level of insulation and airtightnes

PXL_20240131_090844592_edited_edited.jpg

Ready to Start Your Project?

Get in touch with us today and let's make it happen

PXL_20210322_085307996_edited.jpg

Our Way

Committed to Excellence

At Stickbuild Homes Ltd, we’re driven by a commitment to smarter, more sustainable construction. Traditional building methods often generate unnecessary waste, both in materials and energy. By embracing lean construction practices, we streamline the building process, reducing waste, saving costs, and improving efficiency, benefits we pass directly on to our customers.

Environmental responsibility is at the heart of our approach. Using timber frames allows us to minimise carbon impact, create energy-efficient homes, and support sustainable building practices wherever possible.

Above all, our work is guided by a genuine passion for building homes to last. Each project is crafted with care, precision, and durability in mind, ensuring that the homes and structures we create stand the test of time for generations to come.

PXL_20251114_105255472.jpg

Project Spotlight

Magnolia Court

Penthouse Flats on and existing block

A tight access site with no onsite storage, meant stickbuild was the perfect choice for this project. 7 new flats built on the third floor of an existing block, with a new fire barrier floor infill

bottom of page